Genesis Project Inc.
  • Home
  • Who we are
  • What we do
  • Our markets
  • Our Projects
  • Important links
  • News
  • Contact us
  • Corrective Action Implementation

    “He who fails to plan, plans to fail”
    Unknown Author

    CAI 1All too often, the greatest plans fail due to faulty implementation.  This scenario is not uncommon on remediation projects and is usually due to poor planning during the installation, construction, or implementation phase of a project; and/or due to a failure to monitor site conditions.

    Genesis Project staff anticipates these issues up front in order to effectively implement a remediation project.  From a simple soil dig and haul, to the installation of a complex multimedia remediation system, anticipating challenges allows the project to be completed sooner and for a lower cost. CAI 2

    Genesis Project has the technical experience to provide a wide range of remediation services for sites impacted with contaminated soil and/or groundwater. Our personnel have successfully completed projects using a wide variety of treatment technologies and worked extensively in the remediation (in-situ and ex-situ) of impacted soil and groundwater at sites in the following regulatory arenas:

  • RCRA
  • CERCLA
  • HSRA
  • UST
  • All of this experience leads to the confidence that the work will be conducted in a manner that looks after the bottom line.
    Protecting Your Future 1258 Concord Road, Suite 200, Smyrna, GA 30080
    tel: 770.319.7217 • fax: 770.319.7219 • info@genproject.com

    © 2009 Genesis Project, Inc. All Rights Reserved. Design by TH Design